There are two ways to determine connection to the grid price:
1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 % of contractor’s working price. Also, for project preparation household consumers get 20 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity + Fee for 1 m * Shortest geometrical distance from connection point to consumer object
Connection fees approved by Commission (100 %):
Consumer group
|
Fee for 1 kW of increased permissible capacity (PC) without VAT
|
Fee for 1 m of electricity network without VAT
|
I group (PC < 30 kW, no network reconstruction or project needed)
|
110 LTL
|
72 LTL
|
II group (PC < 30 kW, network reconstruction and project needed)
|
653 LTL
|
72 LTL
|
III group (30 < PC < 100)
|
315 LTL
|
82 LTL
|
IV group (100 < PC < 500)
|
239 LTL
|
63 LTL
|
Household customers pay 20% of the approved connection fee:
Consumer group
|
Fee for 1 kW of increased permissible capacity (PC) without VAT
|
Fee for 1 m of electricity network without VAT
|
I group (PC < 30 kW, no network reconstruction or project needed)
|
22 LTL
|
14,4 LTL
|
II group (PC < 30 kW, network reconstruction and project needed)
|
130,6 LTL
|
104,48 LTL*
|
14,4 LTL
|
11,52 LTL*
|
III group (30 < PC < 100)
|
63 LTL
|
50,4 LTL*
|
16,4 LTL
|
13,12 LTL*
|
IV group (100 < PC < 500)
|
47,8 LTL
|
38,24 LTL*
|
12,6 LTL
|
10,08 LTL*
|
*Fee for household consumers who prepare project themselves.
Example:
Permissible capacity – 15 kW
No reconstruction or project needed
Shortest geometrical distance – 20 m
Connection price = 22 Lt * 15 kW + 14,4 Lt * 20 m = 618 LTL
All other consumers except household consumers pay 40% of the approved connection fee:
Consumer group
|
Fee for 1 kW of increased permissible capacity (PC) without VAT
|
Fee for 1 m of electricity network without VAT
|
I group (PC < 30 kW, no network reconstruction or project needed)
|
44 LTL
|
28,8 LTL
|
II group (PC < 30 kW, network reconstruction and project needed)
|
261,2 LTL
|
235,08 LTL*
|
28,8 LTL
|
25,92 LTL*
|
III group (30 < PC < 100)
|
126 LTL
|
113,4 LTL*
|
32,8 LTL
|
29,52 LTL*
|
IV group (100 < PC < 500)
|
95,6 LTL
|
86,04 LTL*
|
25,2 LTL
|
22,68 LTL*
|
*Fee for all other consumers (except household consumers) who prepare project.
Example:
Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer
Connection price = 235,08 * 15 kW + 25,92 Lt * 20 m = 4044,6 LTL
Last Update: 2013-06-17 14:47
|