There are two ways to determine connection to the grid price:

1. Public procurement. This method is applied if increased permissible capacity exceeds 500 kW. In that case household consumers pay 20 %, other consumers (except household) – 40 %, producers of electricity – 100 %  of contractor’s working price. Also, for project preparation household consumers get 20 %, other consumers – 10 % discount.
2. Formula and Commission approved fees. This method is applied if increased permissible capacity does not exceed 500 kW. Formula:
Price = Fee for 1 kW * Increased permissible capacity  + Fee for 1 m * Shortest geometrical distance from connection point to consumer object

Connection fees approved by Commission (100 %):


Consumer group

Fee for 1 kW of increased permissible capacity (PC) without VAT

Fee for 1 m of electricity network without VAT

I group (PC < 30 kW, no network reconstruction or project needed)

110 LTL

72 LTL

II group (PC < 30 kW, network reconstruction and project needed)

653 LTL

72 LTL

III group (30 < PC < 100)

315 LTL

82 LTL

IV group (100 < PC < 500)

239 LTL

63 LTL


Household customers pay 20% of the approved connection fee:

Consumer group

Fee for 1 kW of increased permissible capacity (PC) without VAT

Fee for 1 m of electricity network without VAT

I group (PC < 30 kW, no network reconstruction or project needed)

22 LTL

14,4 LTL

II group (PC < 30 kW, network reconstruction and project needed)

130,6 LTL

104,48 LTL*

14,4 LTL

11,52 LTL*

III group (30 < PC < 100)

63 LTL

50,4 LTL*

16,4 LTL

13,12 LTL*

IV group (100 < PC < 500)

47,8 LTL

38,24 LTL*

12,6 LTL

10,08 LTL*

*Fee for household consumers who prepare project themselves.

Example:
Permissible capacity – 15 kW
No reconstruction or project needed
Shortest geometrical distance – 20 m
Connection price = 22 Lt * 15 kW + 14,4 Lt * 20 m = 618 LTL

All other consumers except household consumers pay 40% of the approved connection fee:

Consumer group

Fee for 1 kW of increased permissible capacity (PC) without VAT

Fee for 1 m of electricity network without VAT

I group (PC < 30 kW, no network reconstruction or project needed)

44 LTL

28,8 LTL

II group (PC < 30 kW, network reconstruction and project needed)

261,2 LTL

235,08 LTL*

28,8 LTL

25,92 LTL*

III group (30 < PC < 100)

126 LTL

113,4 LTL*

32,8 LTL

29,52 LTL*

IV group (100 < PC < 500)

95,6 LTL

86,04 LTL*

25,2 LTL

22,68 LTL*

*Fee for all other consumers (except household consumers) who prepare project.

Example:
Permissible capacity – 15 kW
Network reconstruction and project needed
Shortest geometrical distance – 20 m
Project is prepared by consumer
Connection price = 235,08 * 15 kW + 25,92 Lt * 20 m = 4044,6 LTL